Quayside Offices, Dock Rd, Ardrossan, KA22 8DA

Academy Place, Lockerbie

Below you will find details on the development size & location as well as site plans, house styles, photographs, internal walk through videos, drone footage and a 360° walkthrough where available.

This area of the old Lockerbie Academy was bought by the Association in January 2018. We delivered a total of 45 new houses and flats for rent. Works started in June 2020.  New tenant’s started moving into homes from June 2021 with full area finished in October 2021.

DEVELOPMENT

Lockerbie Academy

Completion Date

October 2021

AREA

Dumfries & Galloway

ACADEMY TERRACE COMPLETED HOUSING

BUILDING COMMUNITIES IN DUMFRIES & GALLOWAY

1
45 new build houses and flats.
2
Scheduled end date September 2021.
3
Ground floor homes designed for those with wheelchair needs.
ACADEMY PLACE FLYOVER
View the Finished Development Site Flyover.
LOCKERBIE ACADEMY SITE FLYOVER
Check out our Phase 1 Site Flyover.
SITE PORTACABIN TIME LAPSE
Short time-lapse video showing the portacabins being lifted from Lockerbie for reuse.
PROGRESS JANUARY ’21
Some extra footage taken late January 2021 showing progress of the development so far.
ACADEMY PLACE Closing Ceremony Interviews
Interviews and footage of the Academy Place closing ceremony

Collective Architecture was bought by Cunninghame Housing Association in 2018. They developed proposals for ­a brownfield area north of Lockerbie town centre, previously home to Lockerbie Academy.

The aim was to create a homes of different types and sizes. This will cater for the broad needs of the local community. Before the Lockerbie Academy development, no new social housing had been built in Lockerbie since the 1980s.

The design includes 45 new homes for social rent. These include semi-detached, terraced two-storey housing, three wheelchair-adapted properties, cottage flats and amenity bungalows.

LOCKERBIE WALKTHROUGH
A walkthrough of on of our first properties in the Academy site development.

Map Location

Privacy Policy